Porto Barricata - porto turistico nel cuore del delta del Po
ItalyVeneto

Porto Barricata - porto turistico nel cuore del delta del Po

1 Rating
VHF 9

About Porto Barricata - porto turistico nel cuore del delta del Po

The Porto Barricata of Porto Tolle is located in the heart of the Po Delta National Park and precisely in the southern part of the delta in a magnificent natural landscape where it is possible to discover the placid streams and lagoons protected by the slender sand "stalls" . In this environment live numerous species of sedentary and migratory birds that are easy to meet during excursions: red and gray herons, marsh harriers, black-winged stilts, pink flamingos, which are highly attractive for photography and birdwatching enthusiasts. The structure offers the possibility of excursions on horseback or by bicycle, following the banks to discover the internal landscapes shaped over time by the combined action of nature and man. The port, located in the riverbed of the Po and protected from storm surges, is about 300 meters from the mouth and has 320 berths up to 15 meters in length and offers boaters a wide range of services on land and on the quay in compliance with the environmental sustainability. "It is a reality that has been able to marry hospitality and the offer of quality services with policies for environmental protection - says Serra - and the presence in the heart of the Delta del Pone park recognizes the strong commitment in terms of sustainability . In this environment, contact with nature - concludes Serra - is a rewarding and sought-after attraction by boaters that is well integrated with the uniqueness present in our territories and that the marinas in their role as careful dealers help to protect and protect ".

Marina Image
Marina Image
Marina Image
Marina Image

Facilities

iconElectricity
iconPetrol
iconDiesel
iconWater
iconWifi
iconShowers
iconToilets
iconFood
iconBar
iconBoatbuilder
iconHaulout
COORDINATES
44.84715 N, 12.46455 E

Port Information

Telephone

Berth Sizes

< 10m, 10-20m

Depth at MLW

2 - 3m

Manoeuvrability

Fair

Channel Marking

Fair

VHF Channel

9

Port of Entry

No

Overseas Visitor Berths

Yes

Catamaran Berths

Yes

Dock Type

Floating

Style Side To

Yes

Style Stern To

Yes

Tidal Flow

Negligible

Active Winter

Yes

Get Local Knowledge

Download the PredictWind App for detailed local insights, hazards, and amenities.

Weather Forecast

Thu
5AM - 9AM
13 August 2026
  • wind icon
    NE 10 knots decreasing to 8 knots.
  • temp icon
    29°C
  • wave icon
    E 0.5m at 3s period
  • sun icon
    UV Index: 1 - Low
  • rain icon
    Sunny
Thu
9AM - 1PM
13 August 2026
  • wind icon
    NE 7–10 knots.
  • temp icon
    29°C
  • wave icon
    E 0.6m at 4s period
  • sun icon
    UV Index: 7 - High
  • rain icon
    Sunny
Thu
1PM - 5PM
13 August 2026
  • wind icon
    E 8 knots decreasing to 5 knots.
  • temp icon
    29°C
  • wave icon
    E 0.5m at 4s period
  • sun icon
    UV Index: 7 - High
  • rain icon
    Sunny